LCR commenced the project at Jellinbah and Yarrabee in 2006 providing load and haul services from each mine site to the shared Boonal Train Load Out facility.
In consolidating the two haulage operations LCR are able to provide haulage services cost effectively by sharing maintenance personnel and facilities, management and supervision, and equipment sharing to meet surges in volumes.
The Yarrabee component involves hauling 3.25 mtpa of coal 37 km (74 km return) from Yarrabee Coal Mine to the Boonal Train Load Out facility, conducted by 6 x 180t C-Triple haul units, with an additional spare unit. LCR operates a WA800 loader to load the haul units at the Yarrabee Mine.
The Jellinbah component involves hauling 5.2 mtpa of coal 33 km (66 km return) from Jellinbah Plains to the Boonal Train Load Out, or 25 km (50 km return) route from Jellinbah Central to Boonal Train Load Out. LCR perform the Jellinbah component with 7 x 180t C-Triple haul units, with an additional spare unit.
LCR also conducts Stockpile to Stockpile haulage at Jellinbah from mining areas with 1 x 360t Super Hauler unit. The unit hauls approximately 30,000 mt per week as required by Jellinbah.