The Mt Gellibrand Wind Farm project involves the installation of 44 Wind Turbines.
Project Period: September 2017 to March 2018
LCR Completed Contract: February 2018
LCR was engaged by Acciona Energy for the unloading, loading and transport of imported and locally built wind turbine components from Geelong Port and Keppel Prince to Mt Gellibrand Wind Farm site using LCR heavy haulage trucks, trailers and cranes.